North South Corridor – TTM & TIA for N101 & N105

North South Corridor – TTM & TIA for N101 & N105

SYSTRA MVA is contracted on 2 packages: N101 from East Coast Park to Victoria Street (approximately 1km), and N105 between Suffolk Rise and Novena Rise (approximately 1km).

The North-South Corridor is new roadway infrastructure aiming at providing faster road travel times from North (Woodlands) to the city by integrating underground expressway, dedicated bus lanes and dedicated cycling path connecting to PCN (Park Connector Network) and HDB town network. The corridor is 21.5km long.

Our scope of works included:

  • Temporary traffic diversion (TTD) schemes (including pedestrian provision and bus stops relocation) and associated Traffic Impact Assessment (TIA) reports, as well as post TTD schemes implementation inspection and reporting
  • Provision of responses to Safety Division, Project Safety Review (Roads) and Traffic Management Division and Design Development (Roads).
  • Provision of traffic related technical support to Contractor throughout the construction period such as for Events, stakeholder engagements, inputs for traffic lights relocation etc.
Top of the page

Read also

C4361 North-South Expressway From Lentor Avenue To Toa Payoh Rise
C4361 North-South Expressway From Lentor Avenue To Toa Payoh Rise
SYSTRA MVA conducted a temporary traffic diversion design for an (...)
Cibitung-Cilincing Toll Road Traffic And Revenue Forecasting Study
Cibitung-Cilincing Toll Road Traffic And Revenue Forecasting Study
SYSTRA MVA undertook traffic forecast for this future toll road connecting (...)
Dau Giay – Phan Thiet Expressway PPP (Technical Advisory to Support the development)
Dau Giay – Phan Thiet Expressway PPP (Technical Advisory to Support the development)
SYSTRA MVA was tasked in the role of advisory to the World Bank in (...)
Traffic Forecasts for Cikampek-Palimanan (Cipali II) Toll Road
Traffic Forecasts for Cikampek-Palimanan (Cipali II) Toll Road
Ensuring toll road connectivity across the Java Island, Cipali section (...)
CITAS (Cileunyi-Tasikmalaya-Cilacap-Yogyakarta-Solo) Toll Road Traffic and Revenue Forecasting Study & Survey
CITAS (Cileunyi-Tasikmalaya-Cilacap-Yogyakarta-Solo) Toll Road Traffic and Revenue Forecasting Study & Survey
SYSTRA MVA is appointed by the investor to undertake the traffic and (...)
C1006 Cross Island Line East (CRLE)
C1006 Cross Island Line East (CRLE)
SYSTRA MVA were commissioned to undertake the temporary traffic diversion (...)
CBD Area Concept Temporary Traffic Management Schemes for KL-KVMRT Line 1
CBD Area Concept Temporary Traffic Management Schemes for KL-KVMRT Line 1
SYSTRA MVA to assist with the Temporary Traffic Management Planning and (...)
J1001 Jurong Region Line (JRL) Mainline
J1001 Jurong Region Line (JRL) Mainline
SYSTRA MVA was appointed as Traffic Consultant to provide advance (...)
SYSTRA MVA SINGAPORE PTE LTD Co. Reg. No. 200101031G