MyHSR Reference Design Contract 01 (RDC01) Station Design for Bandar Malaysia & Iskandar Puteri

MyHSR Reference Design Contract 01 (RDC01) Station Design for Bandar Malaysia & Iskandar Puteri

Working as part of the SYSTRA SA led design team, SYSTRA-MVA was responsible for the pedestrian assessment and planning of the two international stations in Malaysia for the proposed Singapore-KL HSR project.

SYSTRA MVA undertook the assessment of internal flows using both first principles planning techniques and the VISWALK software. In addition, we undertook Traffic Impact Assessment (TIA) and Temporary Traffic Management (TTM) Studies for the two stations - Bandar Malaysia and Iskandar Puteri.

Top of the page

Read also

North South Corridor – TTM & TIA for N101 & N105
North South Corridor – TTM & TIA for N101 & N105
SYSTRA MVA is contracted on 2 packages: N101 from East Coast Park to (...)
Marina Bay Cruise Centre Traffic Study
Marina Bay Cruise Centre Traffic Study
SYSTRA MVA was appointed by the Singapore Tourism Board (STB) to study and (...)
Lippo Cikarang Orange Country Traffic Advisory
Lippo Cikarang Orange Country Traffic Advisory
SYSTRA MVA has been engaged by Lippo to provide traffic advisory services (...)
Yishun Bus Interchange Pedestrian Modelling
Yishun Bus Interchange Pedestrian Modelling
SYSTRA MVA were appointed to undertake a traffic simulation study to model (...)
Pedestrian Modelling For Proposed Development Of New School Along Sin Ming Avenue
Pedestrian Modelling For Proposed Development Of New School Along Sin Ming Avenue
SYSTRA MVA were appointed to undertake a pedestrian simulation study (...)
C1006 Cross Island Line East (CRLE)
C1006 Cross Island Line East (CRLE)
SYSTRA MVA were commissioned to undertake the temporary traffic diversion (...)
Pedestrian Modelling For KV-MRT Pasar Seni Interchange Station - Blue Line, CBD Section
Pedestrian Modelling For KV-MRT Pasar Seni Interchange Station - Blue Line, CBD Section
SYSTRA MVA undertake to analyse a future planned pedestrian link connection (...)
CBD Area Concept Temporary Traffic Management Schemes for KL-KVMRT Line 1
CBD Area Concept Temporary Traffic Management Schemes for KL-KVMRT Line 1
SYSTRA MVA to assist with the Temporary Traffic Management Planning and (...)
J1001 Jurong Region Line (JRL) Mainline
J1001 Jurong Region Line (JRL) Mainline
SYSTRA MVA was appointed as Traffic Consultant to provide advance (...)
E1001 Eastern Region Line (ERL) - 4 In 1 Depot And Mrt Stations (Pedestrian And Traffic Advisory / Construction Stage)
E1001 Eastern Region Line (ERL) - 4 In 1 Depot And Mrt Stations (Pedestrian And Traffic Advisory / Construction Stage)
E1001 contract comprises the rail depot, a multi-storey bus depot and the (...)
C1701 Advanced Consultancy Services for Canberra Station (NS12) on North-South Line
C1701 Advanced Consultancy Services for Canberra Station (NS12) on North-South Line
SYSTRA MVA was appointed to provide traffic consultancy for the proposed (...)
SYSTRA MVA SINGAPORE PTE LTD Co. Reg. No. 200101031G