Indonesia National Road Development Study

Indonesia National Road Development Study

SYSTRA MVA was engaged to undertake the traffic modelling and transport planning on a national roads planning project for all major toll road and national road links and used this to prioritise future road development implementation plans.

Indonesia’s trade competitiveness and future growth prospects depend on strong action to improve connectivity between economic centres. The slow development of expressways and the low capacity of the arterial network in response to rapidly rising traffic demand.

The Masterplan for upgrading of the Arterial Road Network and Implementation of Toll Roads sets out Indonesia’s economic development aspirations for the period up to 2025. For roads this implies high-capacity, high-speed inter-regional connections between main centres and good local connectivity with feeder markets and production centres. The MP3EI vision focuses on the potential development advantages inherent in each region throughout the country. On that basis six economic corridors were identified: Sumatra, Java, Kalimantan, Sulawesi, Bali–Nusa Tenggara, and Papua–Kepulauan Maluku.

SYSTRA MVA have developed traffic models of Java and Sumatra for all major toll road and national road links and used this to prioritise future road development implementation plans. We has also covered a review of required road infrastructure on other major islands of Sulawesi, Kalimantan and Nusa Tenggara.

The study objectives were to identify major issues and to propose solutions and improvements:

  • Planning for the National Roads Network in Indonesia
  • Establishing an Expressway Masterplan
  • Implementation Plans for 5-year Periods for upgrading of the Arterial Road Network and Implementation of Toll Roads
  • Traffic models have been developed for the main islands of Java and Sumatra based on latest data
Top of the page

Read also

Domestic Ferry And Launch Services Consultancy Study
Domestic Ferry And Launch Services Consultancy Study
SYSTRA MVA to undertake a market study of the current and potential ferry (...)
PL181 JB-Singapore RTS Link Study - Patronage Forecasting Studies
PL181 JB-Singapore RTS Link Study - Patronage Forecasting Studies
The Johor Bahru-Singapore Rapid Transit System (RTS Link) is an initiative (...)
Greater One North Traffic And People Mover System Studies
Greater One North Traffic And People Mover System Studies
SYSTRA MVA responsible for detailed study exploring public transport (...)
Bandung Low Carbon Mobility Plan
Bandung Low Carbon Mobility Plan
In this project SYSTRA Paris is selected to be the main consultant whilst (...)
Planning and Forecasting Advisory Services for KL-KVMRT Line 3 (Circle Line)
Planning and Forecasting Advisory Services for KL-KVMRT Line 3 (Circle Line)
SYSTRA MVA was appointed as traffic consultant to provide planning and (...)
Development Of A Public Transport Demand Forecasting Model
Development Of A Public Transport Demand Forecasting Model
SYSTRA MVA was tasked by SMRT with analysing ticket data, building and (...)
Cibitung-Cilincing Toll Road Traffic And Revenue Forecasting Study
Cibitung-Cilincing Toll Road Traffic And Revenue Forecasting Study
SYSTRA MVA undertook traffic forecast for this future toll road connecting (...)
Dau Giay – Phan Thiet Expressway PPP (Technical Advisory to Support the development)
Dau Giay – Phan Thiet Expressway PPP (Technical Advisory to Support the development)
SYSTRA MVA was tasked in the role of advisory to the World Bank in (...)
CITAS (Cileunyi-Tasikmalaya-Cilacap-Yogyakarta-Solo) Toll Road Traffic and Revenue Forecasting Study & Survey
CITAS (Cileunyi-Tasikmalaya-Cilacap-Yogyakarta-Solo) Toll Road Traffic and Revenue Forecasting Study & Survey
SYSTRA MVA is appointed by the investor to undertake the traffic and (...)
Airport Locations Comparative Surface Access Study
Airport Locations Comparative Surface Access Study
SYSTRA MVA has undertaken the ridership and revenue forecast exercise for (...)
© 2020 MVA. All Rights Reserved